Glossary

Plain-English definitions of the terms used on this site. Underlined terms elsewhere on the site link here.

NNC (Notice of Non-Compliance)

A written notice from Arkansas DEQ listing problems an inspector found at a permitted site. The permit holder must respond in writing describing the corrections. DEQ then reviews the response and finds it adequate or inadequate.

DEQ (Arkansas Division of Environmental Quality)

The state agency that issues and enforces construction stormwater permits in Arkansas. Its public records are searchable in the SEEK database.

CGP (Construction General Permit)

The state permit that covers stormwater from construction sites that disturb one acre or more, or that are part of a larger planned development. Coverage is shown by a permit tracking number such as ARR158988.

SWPPP (Stormwater Pollution Prevention Plan)

The site-specific plan a permitted construction site must keep and follow. It shows where erosion and sediment controls go, how they are inspected, and how materials like concrete washout are handled.

BMP (Best Management Practice)

Any control used to keep soil and pollutants on a construction site, such as silt fence, inlet protection, rock construction entrances, seeding and lined washout areas.

Silt fence

A fabric fence, trenched into the ground, that slows runoff and traps sediment. It stops working if it is torn, undercut, knocked down or overfilled.

Inlet protection (inlet sock or wattle)

A filter placed at or over a storm drain inlet to catch sediment before it enters the pipe. If it is pushed aside, the inlet is unprotected.

Concrete washout

The slurry left when concrete trucks, chutes and tools are rinsed. The EPA describes it as caustic, with a pH near 12, and containing toxic metals. Permits require it to be contained, usually in a lined pit or container.

Sediment

Soil, sand and mud carried by runoff. The EPA calls sediment the primary pollutant of concern from construction sites. It clouds water, harms aquatic life and fills storm drains and ditches.

MS4 (Municipal Separate Storm Sewer System)

A city’s storm drain system: streets, inlets, pipes and ditches that carry rainwater to creeks without treatment. Cities with an MS4 permit must have programs to control construction site runoff, including inspections and enforcement.

Detention pond

A basin that temporarily holds stormwater and releases it slowly, to reduce flooding downstream.

Trickle channel

A narrow channel in the bottom of a detention pond that carries small flows to the outlet so the pond drains and does not hold standing water.

Performance bond

A financial guarantee a developer gives the City that required improvements, such as streets and drainage, will be finished. The City releases it once the work is accepted.

Maintenance bond

A guarantee that the developer will repair defects in accepted improvements for a set period, often two years.

LOMR / LOMR-F (Letter of Map Revision)

A FEMA decision changing a flood map. A LOMR-F is based on fill placed to raise land above the base flood elevation.

FOIA (Arkansas Freedom of Information Act)

The state law that gives anyone the right to inspect and copy public records, generally within three working days. See the FOIA Resource Center.