What Arkansas DEQ records and a resident’s documentation show about construction stormwater at two Elkins sites in 2026: the Lennar build-out at Stokenbury Farms Phase 2, and the apartment project at 2393 N Center St.
Status as of November 12, 2026. Agency records come from the Arkansas Division of Environmental Quality (DEQ) SEEK database and an Arkansas FOIA request. Photos and videos are the author’s own. This page summarizes the record; it is not legal or engineering advice. Statuses can change, and this page will be updated. Photos and videos appear under the date they were taken or submitted; house numbers, license plates and identifiable people have been blurred or left out, and videos have no sound.
Jump to: Short version · Why it matters · Photo highlights · Lennar site · Apartments · DEQ records
Watch: Where Does It Go?
New to this issue? Start here.
The Short Version
- Two sites, six state inspections. DEQ inspected the Lennar site four times (Apr 20, Jul 2, Aug 25 and Oct 8, 2026) and the N Center St apartment site twice (May 6 and Jul 2, 2026). Every inspection found potential non-compliance.
- Lennar: four Notices of Non-Compliance. Findings included silt fence down and undercut, inlet protection failed or missing, a concrete washout not maintained to prevent overflows, sediment tracked off site, and site inspections that did not record visible problems.
- One Lennar notice is still open. On November 10, 2026, DEQ found Lennar’s response to the October 8 inspection inadequate and set a November 23, 2026 deadline. The letter notes that unresolved items “may be elevated to a formal enforcement action, which may include civil penalties.”
- Apartment site: evaluated as an unpermitted construction site. DEQ’s May 6 evaluation was an unpermitted-site evaluation, and its records list potential violations that are now marked resolved. It recorded off-site tracking at both entrances and sediment washing onto the neighboring property. DEQ found the first response inadequate on Aug 3, accepted a revised response on Aug 13, and both notices are now closed.
- Resident documentation was used. DEQ’s April 20 inspection report cites photographs provided by the complainant showing sediment entering the creek and the washout overflowing.
- Conditions continue to be documented. Photos and video from November 7–8, 2026 show sediment tracked onto streets and light-colored residue along the curb line below the designated washout area.
Where Things Stand
- NNC-26-00604 (Lennar, Apr 20 inspection): Closed
- NNC-26-00690 (Lennar, Jul 2 inspection): Lennar responded Jul 27, Jul 29 and Aug 10
- NNC-26-01010 (Lennar, Aug 25 inspection): Closed. Response found adequate Nov 10, 2026
- NNC-26-01009 (Lennar, Oct 8 inspection): Open. Response found inadequate Nov 10, 2026; new response due Nov 23, 2026
- NNC-26-00605 (Apartments, May 6 evaluation): Closed. Inadequate Aug 3, adequate Aug 13, 2026
- NNC-26-00692 (Apartments, Jul 2 evaluation): Closed. Adequate Aug 13, 2026
Why It Matters
Concrete washout is the gray-white slurry left when concrete trucks and tools are rinsed. According to the U.S. EPA, it contains toxic metals and is caustic and corrosive, with a pH near 12 (liquid drain cleaner is about 13.5). It can harm fish gills and eyes and interfere with reproduction; the safe range for freshwater aquatic life is pH 6.5 to 9. On land it can alter soil chemistry, inhibit plant growth and contaminate groundwater. That is why construction permits require a contained, lined washout area. Washout that escapes onto the ground, the curb or the street can flow into storm drains, which carry water untreated to local creeks. EPA fact sheet
Sediment (mud and dirt) is, in the EPA’s words, “the primary pollutant of concern associated with construction site stormwater runoff.” Excess sediment clouds water, blocks sunlight from aquatic plants, clogs fish gills and smothers habitat and spawning areas.
Infrastructure: sediment also settles in storm drains, pipes and ditches and reduces how much water they can carry during heavy rain, and cleaning them out is a public maintenance cost. In Stokenbury Farms, the City’s own engineer noted in 2023 that sediment was “impacting flow in some outlets.” See Engineering Records.
The controls you see in the photos (silt fence, inlet socks or wattles, lined washout pits, rock construction entrances) exist to keep these materials on the construction site. When they are damaged, displaced or overflowing, the materials can leave the site.
Photo Highlights
A few representative images from six months of documentation. Every photo and video appears below under the date it was taken or submitted. Images show conditions as observed; compliance determinations are made by the agencies.






Stokenbury Farms Phase 2 (Lennar Homes of Arkansas, LLC)
Permit: Construction Stormwater General Permit coverage ARR158988, effective Feb 26, 2026; 93.2 total acres, 21.6 disturbed. The permit holder recertified coverage on Sep 1, 2026.
April 2026 · 5 entries
Apr 6, 2026
Resident files a complaint with DEQ about stormwater conditions at the Lennar build-out in Stokenbury Farms (SEEK complaint HQM-KXBB-NX4R7).
Source: DEQ SEEK complaint record
Apr 20, 2026
DEQ inspection #1. The inspector records erosion controls not adequately maintained, “silt fencing down and undercut,” straw wattles fallen into storm drain inlets, and a concrete washout “not maintained or pumped often enough to prevent overflows,” with the adjacent inlet protection failed. Site inspection records were kept, but “no issues are documented on forms when discovered.” The report also cites photographs provided by the complainant showing sediment entering the creek and the washout overflowing in dry and wet weather.
Source: DEQ Evaluation EVAL-WW-132720
Apr 21, 2026
Resident submits video and photos of a dry-weather discharge observed Apr 20.
Source: Resident submission to DEQ


Apr 24, 2026
Resident submits post-rain photos of inlet protection and street runoff.
Source: Resident submission to DEQ




Apr 29, 2026
Resident submits photos and video of the Apr 29 rain event, including muddy water in the creek below the subdivision.
Source: Resident submission to DEQ




May 2026 · 4 entries
May 6, 2026
Resident submits rain-event photos.
Source: Resident submission to DEQ



May 8, 2026
Resident submits photos of the designated washout area taken May 7.
Source: Resident submission to DEQ


May 18, 2026
Resident submits pre-storm photos.
Source: Resident submission to DEQ




May 19–21, 2026
Resident documents the May 19 rain event and submits photos May 21.
Source: Resident submission to DEQ



June 2026 · 5 entries
Jun 8, 2026
Resident submits video and photos of washout slurry, sediment bypassing a curb inlet, street runoff and off-site roadway sediment; later that day, photos of silt fence by the creek, tractor tracks and the washout.
Source: Resident submission to DEQ







Jun 9, 2026
Resident submits video and photos of concrete truck activity and a discharge at the washout area.
Source: Resident submission to DEQ



Jun 15–16, 2026
Resident submits additional washout observations, including wet discharge spreading down the roadway.
Source: Resident submission to DEQ







Jun 24–25, 2026
Resident submits a site-condition package and photos from the Jun 24 rain event, including runoff reaching the downstream channel.
Source: Resident submission to DEQ













Jun 26, 2026
DEQ issues Notice of Non-Compliance NNC-26-00604 to Lennar. Lennar submits its response Jul 10, 2026.
Source: NNC-26-00604; SEEK response HQP-XTNX-RH6HD
July 2026 · 7 entries
Jul 1, 2026
Resident submits photos of the concrete washout.
Source: Resident submission to DEQ



Jul 2, 2026 (morning)
Resident submits a drainage pathway photo and video the morning of DEQ’s second inspection.
Source: Resident submission to DEQ


Jul 2, 2026
DEQ inspection #2. The inspector finds the most recent site inspection “over a month old,” storm drain inlet filters “not installed or maintained,” soil not stabilized by a storm drain outlet that discharges to the creek, “evidence of sediment being washed into drainage,” and “some track out.”
Source: DEQ Evaluation EVAL-WW-132844
Jul 11–12, 2026
Resident documents the Jul 11 rain event (muddy runoff across streets, sediment passing inlet protection, turbid water in the downstream channel) and submits the package Jul 12.
Source: Resident submission to DEQ









Jul 15, 2026
Resident submits photos from another rain event.
Source: Resident submission to DEQ






Jul 16, 2026
DEQ issues NNC-26-00690 for the Jul 2 inspection: site inspections not done at the frequency the stormwater plan requires (the most recent was “over a month old”), storm drain inlet filters “not installed or maintained,” soil not stabilized by the storm drain outlet that discharges to the creek, and sediment tracked off site and washed into storm drain inlets. Response due Jul 30. Lennar submits responses Jul 27, Jul 29 and Aug 10.
Source: NNC-26-00690; SEEK response HQQ-BXHD-KJTS4
Jul 30, 2026
Resident submits a photo of concrete being placed with no washout in view.
Source: Resident submission to DEQ

August 2026 · 4 entries
Aug 5, 2026
Resident submits stockpile and drainage observations, including a stockpile next to the public sidewalk and active concrete placement.
Source: Resident submission to DEQ





Aug 19, 2026
Resident documents the concrete washout.
Source: Resident photos and video

Aug 24, 2026
Resident submits rain-event observations: ponding upstream of a storm drain inlet, runoff entering the inlet and sediment entering the drainage system, with a street-sign photo marking the location (Jessica Leigh Ln and Bayli Ln).
Source: Resident submission to DEQ, SEEK complaint HQR-226K-H9WTW







Aug 25, 2026
DEQ inspection #3. The inspector could not find the permit notice posted on site or the job box with the stormwater plan and inspection reports. Lennar’s own inspection report from the day before “did not address obvious silt entering storm drain inlets” or inlet filters that had been “drawn into the inlet or had gaps.”
Source: DEQ Evaluation EVAL-WW-132970
September 2026 · 7 entries
Sep 1, 2026
Lennar recertifies its permit coverage.
Source: SEEK recertification HQR-7KAG-6VZXV
Sep 6, 2026
Resident documents runoff leaving the disturbed area and curb-and-gutter flow during rain.
Source: Resident submission to DEQ


Sep 10, 2026
Resident documents a leaf blower being used on roadway sediment near a storm inlet. The worker is blurred, and the video is withheld to protect his identity.
Source: Resident submission to DEQ


Sep 13, 2026
Resident documents roadway sediment and inlet protection conditions.
Source: Resident submission to DEQ





Sep 17, 2026
Resident documents light-colored residue in the gutter and partially protected storm drain inlets.
Source: Resident photos and video








Sep 20–21, 2026
Resident submits pre- and post-rain photos, including apparent cementitious material downslope of the washout area.
Source: Resident submission to DEQ










Sep 27–28, 2026
Resident submits before-, during- and after-rain documentation.
Source: Resident submission to DEQ





October 2026 · 8 entries
Oct 3–4, 2026
Resident documents a nighttime rain event and its aftermath.
Source: Resident photos and video










Oct 5, 2026
Resident submits a six-month chronology to DEQ with additional photos.
Source: Resident submission to DEQ




Oct 7–8, 2026
Resident documents a new concrete pour and apparent cementitious material at a new inlet.
Source: Resident photos and video





Oct 8, 2026
DEQ inspection #4. Inlet filters “in need of maintenance to remove sediment,” silt fence undercut in the northeast corner, a section of silt fence absent along the drainage ditch on the east side, and dirt “pushed beyond the natural bank of drainage ditch.” Documents were not on site.
Source: DEQ Evaluation EVAL-WW-132976
Oct 14–15, 2026
Resident documents the Oct 14 rain event and submits it Oct 15, including white residue present since Oct 9.
Source: Resident submission to DEQ













Oct 15, 2026
DEQ issues NNC-26-01010 (Aug 25 inspection: inspections not addressing pollutants entering conveyances or control maintenance; permit notice not posted; plan and reports not kept on site) and NNC-26-01009 (Oct 8 inspection: erosion and sediment controls not maintained).
Source: NNC-26-01009; NNC-26-01010
Oct 27, 2026
Lennar submits responses to both notices.
Source: SEEK responses HQS-M572-HQDZ9 and HQS-M4VW-MWHNY
Late Oct – Nov 2, 2026
Resident documents site conditions in late October and shares them, along with City FOIA records, with EPA and DEQ on Nov 2.
Source: Resident correspondence

November 2026 · 6 entries
Nov 7–8, 2026
Resident photos and video show sediment tracked onto the street from active lots and light-colored residue along the curb line below the “Designated Wash Out” area.
Source: Resident photos and video







Nov 10, 2026
DEQ accepts Lennar’s response to NNC-26-01010. DEQ finds the response to NNC-26-01009 inadequate “due to lack of necessary documentation (i.e., photos, dates, and deadlines),” specifically for “the damaged and undercut silt fencing along the dry drainage channel on the Eastern edge of the current construction area and the dirt pushed past the bank of that same drainage.” New response due November 23, 2026.
Source: DEQ letters dated Nov 10, 2026 (adequate, inadequate)
Nov 11, 2026
Resident shares updated documentation, including the Nov 7–8 photos and video, with DEQ and EPA.
Source: Resident correspondence
Nov 12, 2026
Morning resident photos and video show curb inlet protection displaced at two inlets, leaving inlet openings uncovered; light-colored residue on the ground outside the lined concrete washout and along the curb line; sediment tracked onto the street; and white residue in the gutter near a new sidewalk pour. These show conditions as observed and are not a compliance determination.
Source: Resident photos and video








Nov 12, 2026 (evening)
About 12 hours after the morning conditions above were documented and reported to regulators, and while DEQ Notice of Non-Compliance NNC-26-01009 remained open (see Nov 10), evening resident photos and video taken around 6:11–6:15 p.m. show that the concrete washout area, which appeared full earlier in the day, appeared to have been widened; wet, light-colored material in the street and along the gutter, with tire tracks running through it; and leaf blowers in use on the site, creating a heavy cloud of dust across the street. These show conditions as observed and are not a compliance determination.
Source: Resident photos and video


Nov 13, 2026 (morning)
The morning after the evening observations above, resident photos and video taken around 7 a.m. show light-colored residue still in the street and along the curb and gutter near the “Designated Wash Out” sign, with tire tracks running through it. The lined washout area held standing water and light-colored material, with similar material on the ground outside the liner, and sediment was at the street edge. Frost was on the ground; the residue appeared different from the frost and was in the same areas documented the evening before. These show conditions as observed and are not a compliance determination.
Source: Resident photos and video




Date not recorded · 1 entry
Date not recorded
Additional resident photo.
Source: Resident photos and video

2393 N Center St (Elks Landing Apartments)
Developer: McGowan Built Properties. DEQ evaluated this site as an unpermitted construction site.
April–May 2026 · 4 entries
Apr 22, 2026
Resident files a complaint with DEQ about the apartment project (SEEK complaint HQN-0E9D-NA5BD).
Source: DEQ SEEK complaint record
Spring 2026 (date not recorded)
Resident photos of the site: stockpiled soil, sediment tracked onto the highway at the entrance, boards laid over a trench, and the dumpster area.
Source: Resident photos and video





May 6, 2026
DEQ unpermitted-site evaluation. The inspector records “evidence of sediment being discharged” and “entering drainages,” uncovered stockpiled topsoil next to a stormwater drainage way, uncovered dumpsters, sediment “washing off site onto property to the south,” and “off site tracking observed at both entrances.” A Notice of Coverage and stormwater plan were needed. DEQ’s records list three statutory violations, including construction without a permit and causing pollution of waters of the state.
Source: DEQ Evaluation EVAL-WNOPMT-000179; DEQ violations record
May 21, 2026
Resident submits a photo of runoff at the apartment site.
Source: Resident submission to DEQ

June–July 2026 · 5 entries
Jun 26, 2026
DEQ issues NNC-26-00605.
Source: NNC-26-00605
Jul 1, 2026
Resident submits photos of an unprotected inlet, a trench with no controls, and a site overview.
Source: Resident submission to DEQ



Jul 2, 2026
DEQ second evaluation. “Current sediment controls are inadequate to prevent sediment from entering storm drain inlet and drainage ditches.” Two statutory violations recorded.
Source: DEQ Evaluation EVAL-WNOPMT-000212
Jul 11–12, 2026
Resident documents runoff at the site during the Jul 11 rain, including muddy water at the culvert and the ditch beside Dollar General, and submits it Jul 12.
Source: Resident submission to DEQ





Jul 16, 2026
DEQ issues NNC-26-00692.
Source: NNC-26-00692
August 2026 · 3 entries
Aug 3, 2026
DEQ finds the developer’s July 22 response to NNC-26-00605 inadequate for lack of photos, dates and deadlines.
Source: DEQ letter dated Aug 3, 2026
Aug 13, 2026
DEQ accepts revised responses to both notices. Both are closed.
Source: DEQ letters dated Aug 13, 2026 (NNC-26-00605, NNC-26-00692)
Aug 24, 2026
In a complaint about the Lennar site, the resident also notes that erosion controls previously present at the apartment construction area appeared to have been removed, without drawing conclusions about whether the removal was appropriate.
Source: Resident submission to DEQ, SEEK complaint HQR-226K-H9WTW
Public Records Requests and Agency Contact
May – Nov 2026
Resident shares documentation with the U.S. EPA, Region 6.
Source: Resident correspondence
Jun 10 – Jul 2026
Resident files an Arkansas FOIA request with DEQ for stormwater compliance records, followed by clarification and adequacy-of-search requests. DEQ’s production was compiled Jun 29, 2026.
Source: FOIA correspondence; DEQ production
Jun 24, 2026
Resident files an Arkansas FOIA request with the City of Elkins for construction stormwater and MS4 records. The City later represented its production as complete. The City’s production consisted mainly of a document titled “violation pictures” and two videos titled “Violation Video 1” and “Violation Video 2,” recorded May 7, 2026 according to the file data. The document states that the City’s stormwater representative, who also serves as the Building Official, visits Stokenbury Farms several times a week to perform building inspections and observe whether BMPs are being followed. It states the City understood the apartment site next to Dollar General to be three parcels of less than one acre each, and notes that a SWPPP is typically required only for projects over one acre. It also includes screenshots of text messages between City staff and contractors about track-out and inlet protection.
Source: City of Elkins FOIA production (“violation pictures” document)
Nov 2026
EPA activity.
DEQ Records
Official records from the Arkansas Division of Environmental Quality, downloaded from DEQ’s public SEEK database, and the City of Elkins’ FOIA production. Private individuals’ email addresses, phone numbers and first names have been blacked out; nothing else has been changed.
- 2026-02-26 · DEQ Permit Coverage ARR158988 (Lennar)
- 2026-04-20 · DEQ Inspection (Lennar) EVAL-WW-132720
- 2026-05-06 · DEQ Evaluation (2393 N Center St) EVAL-WNOPMT-000179
- 2026-06-26 · DEQ Notice NNC-26-00604 (Lennar)
- 2026-06-26 · DEQ Notice NNC-26-00605 (2393 N Center St)
- 2026-07-02 · DEQ Evaluation (2393 N Center St) EVAL-WNOPMT-000212
- 2026-07-02 · DEQ Inspection (Lennar) EVAL-WW-132844
- 2026-07-16 · DEQ Notice NNC-26-00692 (2393 N Center St)
- 2026-07-16 · DEQ Notice NNC-26-00690 (Lennar)
- 2026-08-03 · DEQ Inadequate Response NNC-26-00605 (2393 N Center St)
- 2026-08-13 · DEQ Adequate Response NNC-26-00605 (2393 N Center St)
- 2026-08-13 · DEQ Adequate Response NNC-26-00692 (2393 N Center St)
- 2026-08-25 · DEQ Inspection (Lennar) EVAL-WW-132970
- 2026-10-08 · DEQ Inspection (Lennar) EVAL-WW-132976
- 2026-10-15 · DEQ Notice NNC-26-01009 (Lennar)
- 2026-10-15 · DEQ Notice NNC-26-01010 (Lennar)
- 2026-11-10 · DEQ Adequate Response NNC-26-01010 (Lennar)
- 2026-11-10 · DEQ Inadequate Response NNC-26-01009 (Lennar)
- City of Elkins FOIA production · “violation pictures” document
Related: Moratorium Timeline: Stokenbury Farms Detention Ponds
Have records, photos or first-hand information about these sites? Contact us.