The approval and engineering record for Stokenbury Farms Phase 2 in Elkins, Arkansas: what the City approved, the conditions it set, and what engineers said about drainage and detention before and during construction.
Status as of November 12, 2026. These records were produced by the City of Elkins under the Arkansas Freedom of Information Act (Case 72CV-26-3999). This page summarizes them; the linked documents are the source. Records specific to individual homes are not posted.
Why These Records Matter
The Phase 2 approvals were tied to reworking the subdivision’s existing detention ponds, the same ponds at the center of the Moratorium Timeline. The City’s own staff report described the existing ponds as very flat and draining poorly, and approved the plan with conditions on drainage, floodplain review and pond rework. Today, construction on the later phases is the subject of the Stormwater Compliance Chronology.
Timeline
Sep 12, 2019
At a special City Council meeting, the Council adopts Ordinance No. 9-12-19, rezoning about 91.73 acres near 1032 N. Center St from R-1 to R-1/PUD at the request of Rausch Coleman Homes. The City’s engineering consultant, Garver, presents the plans, and residents make public comments. Ordinance · Council minutes
Dec 16, 2019
The Planning Commission considers the Phase 2 preliminary plat (applicant: Rausch Coleman / NWA LD LLC). The staff report says that in Phase 2 “the existing detention ponds will be re-worked and connected to a new larger pond,” because “the existing ponds are very flat and therefore drain poorly.” Staff recommends approval with 25 conditions, including drainage analysis by phase, floodplain and hydrology review, drainage easements and swales along rear lot lines, and possible changes to the pipes under Macy Lane after detailed pond calculations. During public comment, a neighboring property owner asks about drainage along the south side of the project. The Commission approves the preliminary plat with the conditions, 3–1. Staff report · Planning Commission minutes
Undated (preliminary plans)
A sheet from the preliminary grading plans (Crafton Tull, sheet C-122, marked “Preliminary Plans, Not for Construction”) carries reviewer comments. They ask, among other things, how access will occur to the existing ditch for clean-out, and whether a neighboring property will receive increased flow and whether a diversion ditch to the pond is needed. Grading plan sheet C-122
May 11, 2020
Crafton Tull submits its drainage report for the first phase of Phase 2 to the City (871 pages, including calculations and maps). Drainage report (large file)
May 21, 2020
ADEQ issues construction stormwater permit coverage (tracking number ARR156658) to NWA LD, LLC for Stokenbury Farms Phase II. Notice of Coverage
Jul 13, 2020
In a drainage report addendum to the City, Crafton Tull reports that the roadside ditch along Hwy 16 “does not provide positive drainage,” that water collects in it and cannot drain efficiently, and that existing conditions and inadequate maintenance of the ditch do not support the conditions ARDOT intended. It states that post-development flows at the reevaluated study point are lower than pre-development flows, and that construction plans will be revised to provide positive drainage toward the box culvert under Hwy 16. Drainage report addendum
Feb 2024 and Jul 2024
Final plats for Stokenbury Farms III and Stokenbury Farms IV are approved and recorded, with NWA LD LLC as developer and Crafton Tull as engineer. Final Plat, Stokenbury Farms III · Final Plat, Stokenbury Farms IV
Apr 6, 2026
The Planning Commission considers the final plat for Stokenbury Farms Phase 5. Staff report and plat
Jul 1, 2026
After the June 24 public records request, the City’s representative obtains the Phase 2 Stormwater Pollution Prevention Plan (SWPPP), Notice of Intent and Notice of Coverage from Crafton Tull, which sends them by email. Crafton Tull email
Records Sought but Not in This Set
Records the requester has sought that are not in this set include detailed detention pond calculations from the Construction Plan Phase, as-built (record) drawings for the reworked ponds, and documentation showing how the preliminary plat conditions were satisfied. Whether those records exist, and where, is part of the pending FOIA cases. See the FOIA Litigation Center.
Have a correction or an additional record? Email records@nwatransparencyproject.org.