Stormwater Compliance Chronology: Stokenbury Farms and N Center St

What Arkansas DEQ records and a resident’s documentation show about construction stormwater at two Elkins sites in 2026: the Lennar build-out at Stokenbury Farms Phase 2, and the apartment project at 2393 N Center St.

Status as of November 12, 2026. Agency records come from the Arkansas Division of Environmental Quality (DEQ) SEEK database and an Arkansas FOIA request. Photos and videos are the author’s own. This page summarizes the record; it is not legal or engineering advice. Statuses can change, and this page will be updated. Photos and videos appear under the date they were taken or submitted; house numbers, license plates and identifiable people have been blurred or left out, and videos have no sound.

Jump to: Short version · Why it matters · Photo highlights · Lennar site · Apartments · DEQ records

Watch: Where Does It Go?

New to this issue? Start here.

A 90-second explainer: how construction runoff travels from a building site to the storm drain, the creek and Beaver Lake, and what it costs. Includes resident footage from Elkins, 2026.

The Short Version

Where Things Stand


Why It Matters

Concrete washout is the gray-white slurry left when concrete trucks and tools are rinsed. According to the U.S. EPA, it contains toxic metals and is caustic and corrosive, with a pH near 12 (liquid drain cleaner is about 13.5). It can harm fish gills and eyes and interfere with reproduction; the safe range for freshwater aquatic life is pH 6.5 to 9. On land it can alter soil chemistry, inhibit plant growth and contaminate groundwater. That is why construction permits require a contained, lined washout area. Washout that escapes onto the ground, the curb or the street can flow into storm drains, which carry water untreated to local creeks. EPA fact sheet

Sediment (mud and dirt) is, in the EPA’s words, “the primary pollutant of concern associated with construction site stormwater runoff.” Excess sediment clouds water, blocks sunlight from aquatic plants, clogs fish gills and smothers habitat and spawning areas.

Infrastructure: sediment also settles in storm drains, pipes and ditches and reduces how much water they can carry during heavy rain, and cleaning them out is a public maintenance cost. In Stokenbury Farms, the City’s own engineer noted in 2023 that sediment was “impacting flow in some outlets.” See Engineering Records.

The controls you see in the photos (silt fence, inlet socks or wattles, lined washout pits, rock construction entrances) exist to keep these materials on the construction site. When they are damaged, displaced or overflowing, the materials can leave the site.

Photo Highlights

A few representative images from six months of documentation. Every photo and video appears below under the date it was taken or submitted. Images show conditions as observed; compliance determinations are made by the agencies.

Video: runoff leaving a construction area during a storm (resident video)
Video: runoff flowing to a storm drain during a storm (resident video)

Stokenbury Farms Phase 2 (Lennar Homes of Arkansas, LLC)

Permit: Construction Stormwater General Permit coverage ARR158988, effective Feb 26, 2026; 93.2 total acres, 21.6 disturbed. The permit holder recertified coverage on Sep 1, 2026.

April 2026 · 5 entries

Apr 6, 2026

Resident files a complaint with DEQ about stormwater conditions at the Lennar build-out in Stokenbury Farms (SEEK complaint HQM-KXBB-NX4R7).
Source: DEQ SEEK complaint record

Apr 20, 2026

DEQ inspection #1. The inspector records erosion controls not adequately maintained, “silt fencing down and undercut,” straw wattles fallen into storm drain inlets, and a concrete washout “not maintained or pumped often enough to prevent overflows,” with the adjacent inlet protection failed. Site inspection records were kept, but “no issues are documented on forms when discovered.” The report also cites photographs provided by the complainant showing sediment entering the creek and the washout overflowing in dry and wet weather.
Source: DEQ Evaluation EVAL-WW-132720

Apr 21, 2026

Resident submits video and photos of a dry-weather discharge observed Apr 20.
Source: Resident submission to DEQ

Video: 4-20-26 Dry Day

Apr 24, 2026

Resident submits post-rain photos of inlet protection and street runoff.
Source: Resident submission to DEQ

Apr 29, 2026

Resident submits photos and video of the Apr 29 rain event, including muddy water in the creek below the subdivision.
Source: Resident submission to DEQ

Video: April 29 Rain Event 1
Video: April 29 Rain Event 2
May 2026 · 4 entries

May 6, 2026

Resident submits rain-event photos.
Source: Resident submission to DEQ

May 8, 2026

Resident submits photos of the designated washout area taken May 7.
Source: Resident submission to DEQ

May 18, 2026

Resident submits pre-storm photos.
Source: Resident submission to DEQ

May 19–21, 2026

Resident documents the May 19 rain event and submits photos May 21.
Source: Resident submission to DEQ

Video: May 19 Rain Event 1
Video: May 19 Rain Event 2
Video: May 19 Rain Event 3
June 2026 · 5 entries

Jun 8, 2026

Resident submits video and photos of washout slurry, sediment bypassing a curb inlet, street runoff and off-site roadway sediment; later that day, photos of silt fence by the creek, tractor tracks and the washout.
Source: Resident submission to DEQ

Video: 2026-06-08 IMG 9422

Jun 9, 2026

Resident submits video and photos of concrete truck activity and a discharge at the washout area.
Source: Resident submission to DEQ

Video: 2026-06-09 Truck

Jun 15–16, 2026

Resident submits additional washout observations, including wet discharge spreading down the roadway.
Source: Resident submission to DEQ

Video: 2026-06-15 IMG 9560

Jun 24–25, 2026

Resident submits a site-condition package and photos from the Jun 24 rain event, including runoff reaching the downstream channel.
Source: Resident submission to DEQ

Jun 26, 2026

DEQ issues Notice of Non-Compliance NNC-26-00604 to Lennar. Lennar submits its response Jul 10, 2026.
Source: NNC-26-00604; SEEK response HQP-XTNX-RH6HD

July 2026 · 7 entries

Jul 1, 2026

Resident submits photos of the concrete washout.
Source: Resident submission to DEQ

Jul 2, 2026 (morning)

Resident submits a drainage pathway photo and video the morning of DEQ’s second inspection.
Source: Resident submission to DEQ

Video: 2026-07-02 Site 1 Drainage Pathway Video

Jul 2, 2026

DEQ inspection #2. The inspector finds the most recent site inspection “over a month old,” storm drain inlet filters “not installed or maintained,” soil not stabilized by a storm drain outlet that discharges to the creek, “evidence of sediment being washed into drainage,” and “some track out.”
Source: DEQ Evaluation EVAL-WW-132844

Jul 11–12, 2026

Resident documents the Jul 11 rain event (muddy runoff across streets, sediment passing inlet protection, turbid water in the downstream channel) and submits the package Jul 12.
Source: Resident submission to DEQ

Video: July 11 26 Rain Event 2
Video: July 11 Rain Event 1
Video: July 11 Rain Event 5
Video: July 11 Rain Event 7
Video: July 11 Rain Event 9
Video: Site1 Video01 RoadwayRunoff DuringStorm
Video: Site1 Video02 RunoffLeavingConstructionAre
Video: Site1 Video03 DownstreamDrainageFeatur
Video: Site3 Video01 RunoffToStormDrain
Video: Site3 Video02 RoadwayDrainageConditions
Video: Site3 Video03 RunoffPathway DuringStorm

Jul 15, 2026

Resident submits photos from another rain event.
Source: Resident submission to DEQ

Jul 16, 2026

DEQ issues NNC-26-00690 for the Jul 2 inspection: site inspections not done at the frequency the stormwater plan requires (the most recent was “over a month old”), storm drain inlet filters “not installed or maintained,” soil not stabilized by the storm drain outlet that discharges to the creek, and sediment tracked off site and washed into storm drain inlets. Response due Jul 30. Lennar submits responses Jul 27, Jul 29 and Aug 10.
Source: NNC-26-00690; SEEK response HQQ-BXHD-KJTS4

Jul 30, 2026

Resident submits a photo of concrete being placed with no washout in view.
Source: Resident submission to DEQ

August 2026 · 4 entries

Aug 5, 2026

Resident submits stockpile and drainage observations, including a stockpile next to the public sidewalk and active concrete placement.
Source: Resident submission to DEQ

Aug 19, 2026

Resident documents the concrete washout.
Source: Resident photos and video

Video: 2026-08-19 IMG 0115

Aug 24, 2026

Resident submits rain-event observations: ponding upstream of a storm drain inlet, runoff entering the inlet and sediment entering the drainage system, with a street-sign photo marking the location (Jessica Leigh Ln and Bayli Ln).
Source: Resident submission to DEQ, SEEK complaint HQR-226K-H9WTW

Video: 2026-08-24 SedimentEntering

Aug 25, 2026

DEQ inspection #3. The inspector could not find the permit notice posted on site or the job box with the stormwater plan and inspection reports. Lennar’s own inspection report from the day before “did not address obvious silt entering storm drain inlets” or inlet filters that had been “drawn into the inlet or had gaps.”
Source: DEQ Evaluation EVAL-WW-132970

September 2026 · 7 entries

Sep 1, 2026

Lennar recertifies its permit coverage.
Source: SEEK recertification HQR-7KAG-6VZXV

Sep 6, 2026

Resident documents runoff leaving the disturbed area and curb-and-gutter flow during rain.
Source: Resident submission to DEQ

Video: CurbAndGutterFlowConditions 2026-09-06
Video: RunoffLeavingDisturbedArea 2026-09-06
Video: Wattle 2026-09-06

Sep 10, 2026

Resident documents a leaf blower being used on roadway sediment near a storm inlet. The worker is blurred, and the video is withheld to protect his identity.
Source: Resident submission to DEQ

Sep 13, 2026

Resident documents roadway sediment and inlet protection conditions.
Source: Resident submission to DEQ

Sep 17, 2026

Resident documents light-colored residue in the gutter and partially protected storm drain inlets.
Source: Resident photos and video

Video: 2026-09-17 IMG 0456

Sep 20–21, 2026

Resident submits pre- and post-rain photos, including apparent cementitious material downslope of the washout area.
Source: Resident submission to DEQ

Sep 27–28, 2026

Resident submits before-, during- and after-rain documentation.
Source: Resident submission to DEQ

Video: 2026-09-28 IMG 0814
Video: 2026-09-28 IMG 0824
Video: 2026-09-28 IMG 0874
Video: 2026-09-28 IMG 0878
Video: 2026-09-28 IMG 0882
October 2026 · 8 entries

Oct 3–4, 2026

Resident documents a nighttime rain event and its aftermath.
Source: Resident photos and video

Video: 10-3-26 Rain Event 1
Video: 10-3-26 rain event 2
Video: 10-3-26 rain event 7
Video: 10-3-26 rain event 8
Video: 10-3-26 rain event 9
Video: 10-3-26 rain event 12
Video: 10-3-26 rain event 13
Video: 10-3-26 rain event 14

Oct 5, 2026

Resident submits a six-month chronology to DEQ with additional photos.
Source: Resident submission to DEQ

Oct 7–8, 2026

Resident documents a new concrete pour and apparent cementitious material at a new inlet.
Source: Resident photos and video

Video: Cementitious Material In Gutter 10-08-26
Video: New Inlet With Cementitious Material 10-08-26
Video: New Pour1 10 07 2026

Oct 8, 2026

DEQ inspection #4. Inlet filters “in need of maintenance to remove sediment,” silt fence undercut in the northeast corner, a section of silt fence absent along the drainage ditch on the east side, and dirt “pushed beyond the natural bank of drainage ditch.” Documents were not on site.
Source: DEQ Evaluation EVAL-WW-132976

Oct 14–15, 2026

Resident documents the Oct 14 rain event and submits it Oct 15, including white residue present since Oct 9.
Source: Resident submission to DEQ

Video: 2026-10-14 IMG 1355
Video: 2026-10-14 IMG 1360
Video: 2026-10-14 IMG 1361
Video: 2026-10-14 IMG 1365
Video: 2026-10-14 IMG 1370
Video: 2026-10-14 IMG 1373
Video: 2026-10-14 OffSiteLocation
Video: 2026-10-14 PreRainNewWhitResidue

Oct 15, 2026

DEQ issues NNC-26-01010 (Aug 25 inspection: inspections not addressing pollutants entering conveyances or control maintenance; permit notice not posted; plan and reports not kept on site) and NNC-26-01009 (Oct 8 inspection: erosion and sediment controls not maintained).
Source: NNC-26-01009; NNC-26-01010

Oct 27, 2026

Lennar submits responses to both notices.
Source: SEEK responses HQS-M572-HQDZ9 and HQS-M4VW-MWHNY

Late Oct – Nov 2, 2026

Resident documents site conditions in late October and shares them, along with City FOIA records, with EPA and DEQ on Nov 2.
Source: Resident correspondence

Video: 2026-10-30 IMG 1512
Video: 2026-10-31 IMG 1524
November 2026 · 6 entries

Nov 7–8, 2026

Resident photos and video show sediment tracked onto the street from active lots and light-colored residue along the curb line below the “Designated Wash Out” area.
Source: Resident photos and video

Video: 2026-11-07 IMG 1558
Video: 2026-11-08 20261108 065342
Video: 2026-11-08 20261108 065440

Nov 10, 2026

DEQ accepts Lennar’s response to NNC-26-01010. DEQ finds the response to NNC-26-01009 inadequate “due to lack of necessary documentation (i.e., photos, dates, and deadlines),” specifically for “the damaged and undercut silt fencing along the dry drainage channel on the Eastern edge of the current construction area and the dirt pushed past the bank of that same drainage.” New response due November 23, 2026.
Source: DEQ letters dated Nov 10, 2026 (adequate, inadequate)

Nov 11, 2026

Resident shares updated documentation, including the Nov 7–8 photos and video, with DEQ and EPA.
Source: Resident correspondence

Nov 12, 2026

Morning resident photos and video show curb inlet protection displaced at two inlets, leaving inlet openings uncovered; light-colored residue on the ground outside the lined concrete washout and along the curb line; sediment tracked onto the street; and white residue in the gutter near a new sidewalk pour. These show conditions as observed and are not a compliance determination.
Source: Resident photos and video

Video: street, curb and washout area (Nov 12, 6:57 a.m.)
Video: gutter residue near new sidewalk (Nov 12)

Nov 12, 2026 (evening)

About 12 hours after the morning conditions above were documented and reported to regulators, and while DEQ Notice of Non-Compliance NNC-26-01009 remained open (see Nov 10), evening resident photos and video taken around 6:11–6:15 p.m. show that the concrete washout area, which appeared full earlier in the day, appeared to have been widened; wet, light-colored material in the street and along the gutter, with tire tracks running through it; and leaf blowers in use on the site, creating a heavy cloud of dust across the street. These show conditions as observed and are not a compliance determination.
Source: Resident photos and video

Video: Nov 12, 2026, evening (1 of 2)
Video: Nov 12, 2026, evening (2 of 2)

Nov 13, 2026 (morning)

The morning after the evening observations above, resident photos and video taken around 7 a.m. show light-colored residue still in the street and along the curb and gutter near the “Designated Wash Out” sign, with tire tracks running through it. The lined washout area held standing water and light-colored material, with similar material on the ground outside the liner, and sediment was at the street edge. Frost was on the ground; the residue appeared different from the frost and was in the same areas documented the evening before. These show conditions as observed and are not a compliance determination.
Source: Resident photos and video

Video: Nov 13, 2026, morning
Date not recorded · 1 entry

Date not recorded

Additional resident photo.
Source: Resident photos and video


2393 N Center St (Elks Landing Apartments)

Developer: McGowan Built Properties. DEQ evaluated this site as an unpermitted construction site.

April–May 2026 · 4 entries

Apr 22, 2026

Resident files a complaint with DEQ about the apartment project (SEEK complaint HQN-0E9D-NA5BD).
Source: DEQ SEEK complaint record

Spring 2026 (date not recorded)

Resident photos of the site: stockpiled soil, sediment tracked onto the highway at the entrance, boards laid over a trench, and the dumpster area.
Source: Resident photos and video

May 6, 2026

DEQ unpermitted-site evaluation. The inspector records “evidence of sediment being discharged” and “entering drainages,” uncovered stockpiled topsoil next to a stormwater drainage way, uncovered dumpsters, sediment “washing off site onto property to the south,” and “off site tracking observed at both entrances.” A Notice of Coverage and stormwater plan were needed. DEQ’s records list three statutory violations, including construction without a permit and causing pollution of waters of the state.
Source: DEQ Evaluation EVAL-WNOPMT-000179; DEQ violations record

May 21, 2026

Resident submits a photo of runoff at the apartment site.
Source: Resident submission to DEQ

June–July 2026 · 5 entries

Jun 26, 2026

DEQ issues NNC-26-00605.
Source: NNC-26-00605

Jul 1, 2026

Resident submits photos of an unprotected inlet, a trench with no controls, and a site overview.
Source: Resident submission to DEQ

Jul 2, 2026

DEQ second evaluation. “Current sediment controls are inadequate to prevent sediment from entering storm drain inlet and drainage ditches.” Two statutory violations recorded.
Source: DEQ Evaluation EVAL-WNOPMT-000212

Jul 11–12, 2026

Resident documents runoff at the site during the Jul 11 rain, including muddy water at the culvert and the ditch beside Dollar General, and submits it Jul 12.
Source: Resident submission to DEQ

Video: Site2 Video01 InletProtection DuringStorm
Video: Site2 Video02 DownstreamConveyance DuringStorm

Jul 16, 2026

DEQ issues NNC-26-00692.
Source: NNC-26-00692

August 2026 · 3 entries

Aug 3, 2026

DEQ finds the developer’s July 22 response to NNC-26-00605 inadequate for lack of photos, dates and deadlines.
Source: DEQ letter dated Aug 3, 2026

Aug 13, 2026

DEQ accepts revised responses to both notices. Both are closed.
Source: DEQ letters dated Aug 13, 2026 (NNC-26-00605, NNC-26-00692)

Aug 24, 2026

In a complaint about the Lennar site, the resident also notes that erosion controls previously present at the apartment construction area appeared to have been removed, without drawing conclusions about whether the removal was appropriate.
Source: Resident submission to DEQ, SEEK complaint HQR-226K-H9WTW


Public Records Requests and Agency Contact

May – Nov 2026

Resident shares documentation with the U.S. EPA, Region 6.
Source: Resident correspondence

Jun 10 – Jul 2026

Resident files an Arkansas FOIA request with DEQ for stormwater compliance records, followed by clarification and adequacy-of-search requests. DEQ’s production was compiled Jun 29, 2026.
Source: FOIA correspondence; DEQ production

Jun 24, 2026

Resident files an Arkansas FOIA request with the City of Elkins for construction stormwater and MS4 records. The City later represented its production as complete. The City’s production consisted mainly of a document titled “violation pictures” and two videos titled “Violation Video 1” and “Violation Video 2,” recorded May 7, 2026 according to the file data. The document states that the City’s stormwater representative, who also serves as the Building Official, visits Stokenbury Farms several times a week to perform building inspections and observe whether BMPs are being followed. It states the City understood the apartment site next to Dollar General to be three parcels of less than one acre each, and notes that a SWPPP is typically required only for projects over one acre. It also includes screenshots of text messages between City staff and contractors about track-out and inlet protection.
Source: City of Elkins FOIA production (“violation pictures” document)

City of Elkins FOIA production: Violation Video 2 (recorded May 7, 2026, per file data)
City of Elkins FOIA production: Violation Video 1 (recorded May 7, 2026, per file data)

Nov 2026

EPA activity.


DEQ Records

Official records from the Arkansas Division of Environmental Quality, downloaded from DEQ’s public SEEK database, and the City of Elkins’ FOIA production. Private individuals’ email addresses, phone numbers and first names have been blacked out; nothing else has been changed.

Related: Moratorium Timeline: Stokenbury Farms Detention Ponds

Have records, photos or first-hand information about these sites? Contact us.